01

Proposed Sime Darby Workers Quarters at Various Sabah Estates

(Construction Cost: RM20 million)
Status: Completed
The project consisted of 350 units of workers quarters location at 17 sites in Sabah, Malaysia.

02

Proposed Piling Remedy Works For Proposed 54 Units of Semi-Detached Pool At

Tropicana
Status: Completed with CCC
The project involved the checking and proposal of foundation piling remedy works.

03

Cadangan Pembangunan 2 Blok Apartment Berservis 24 Tingkat (408 Unit) Di Atas Lot

26771, 27842, 28161, 28354 (Lot Lama 26824) Dan Tanah Kerajaan Di Jalan Kolam Air, Desa Melawati Mukim Setapak, Wilayah Persekutuan Kuala Lumpur
Status: Completed
The project involved the checking and proposal of foundation piling remedy works.
Great challenges were encountered where 90% of the total piling points have deviated more than the permissible requirement.

04

PROTON SHAH ALAM – Cadangan Membina Tambahan Dan Pindaan Kilang Setingkat

Kepada Komplek Kilang Pengacuan (Casting ) 2 Tingkat Yang Sediada Di No.1, JalanHakim U1/24 Seksyen U1, 40150 Shah Alam, Selangor Darul Ehsan
(Estimated Construction Cost: RM4 million)
Status: Completed
The project involved the design and construction of extension of an existing car assembly factory in Shah Alam, Selangor Malaysia. Value engineering solutions were adopted, and the project was completed in less than 4 months ahead of schedule.

05

University Malaysia Kelantan – Bachok, Kelantan – Spaceframe Steel Structure

Project Value : RM260,000.00
Areas : 39m x 35m
Date of Completed : June 2011

06

VALUE ENGINEERING DESIGN for Cadangan Pembangunan Yang Mengandungi: – 1) 4 Blok Pangsapuri 4 & 5 Tingkat, 2) 3 Blok Pangsapuri 9 Tingkat, 1 Unit Rumah Kelab 2 Tingkat (Yang Mengandungi Kolam Renang Tadika, Dewan Serbaguna Dan Kafeteria) Dan 2 Tingkat Basemen Tempat Letak Kereta Di Atas Lot 20926 (HSD 48924), PT 11921, Jalan Persiaran Kemajuan SS16, Mukim Damansara, Daerah Petaling, Selangor Darul Ehsan

(Estimated Construction Cost: RM90 million)
Status: Completed with CCC
The project is a high-end residential development with a total construction cost of
RM150 million for all phases. VED is appointed to provide a value engineering solution.
We are able to provide an estimated cost saving of more than RM3 million.

07

Cadangan Membina 92 Unit Bangunan Kedai Pejabat Yang Mengandungi : 1) 20 Unit – 6 1/2 Tingkat Kedai Pejabat 2) 36 Unit – 4 1/2 Tingkat Kedai Pejabat 3) 36 Unit – 3 Tingkat Kedai Pejabat 4) 4 Unit – Pencawang Elektrik 5) 1 Tingkat Tempat Letak Kereta Bawah Tanah Di Atas Lot P.T. 14532, Jalan SS 7/26 Kelana Jaya, Mukim Damansara, Daerah Petaling, Selangor Darul Ehsan (PHASE 1 & 2)

(Estimated Construction Cost: RM100 million)
Status: Completed with CCC
The project is a high-end commercial development located in the heart of Petaling Jaya, Selangor, Malaysia. VED is appointed to the development not only to provide normal consultancy services, but also have incorporated value engineering solutions.

08

VALUE ENGINEERING DESIGN for Cadangan Pembangunan Pangsapuri Mewah 157 Unit Setinggi 24 Tingkat Berserta 15 Unit Villa 4 Tingkat Di Atas Lot 39868, Jalan 13/155C, Mukim Petaling, Daerah Kuala Lumpur, Wilayah Persekutuan

(Estimated Construction Cost: RM150 million)
Status: Completed with CCC
“The Treez – Jalil Residence @ Bukit Jalil comprises of luxurious condominiums built on a 2.6-acre land. This residential development is designed to be the first green residential community in southern KL. VED is appointed to provide a value engineering solution. Throughout the value engineering exercise, we are able to provide an estimated cost saving of more than RM2 million.
The design included a transfer plate with post tensioning with a thickness of 900mm.

09

Cadangan Meroboh & Membina Semula Sebuah Rumah Banglo 3 Tingkat Di Atas Lot 28364 (No:82), Jalan Jelutong, Damansara Endah, Kuala Lumpur

(Estimated Construction Cost: RM3 million)
Status: Completed with CCC

10

Cadangan Membina Sebuah Rumah Banglo 2 Tingkat Diatas Lot 103084, Jalan Damar Bayu 5, Glenmarie Cove, Mukim Klang, Daerah Klang, Bandar Diraja Selangor, Selangor Darul Ehsan

(Estimated Construction Cost: RM4 million)
Status: Completed with CCC