Cadangan Membina Dan Menyiapkan sebuah Pangsapuri Perkhidmatan 30 Tingkat Yang Mengandungi:
- 1 Tingkat "Lower Ground"
- 1 Tingkat Tempat Letak Kereta / Kedai
- 6 Tingkat Tempat Letak Kereta Podium
- 1 Tingkat Lantai Rekreasi
- 20 Tingkat Pangsapuri Perkhidmatan
- 1 Tingkat "Penthouse"
di Atas Lot 36260, 36261 Dan 36262, jalan Awam Selimpat, Taman Yarl, mukim Petaling, Daerah Kuala Lumpur, wilayah Persekutuan. untuk Tetuan Virtual Innovation Technologies Sdn. Bhd.

(Estimated Construction Cost: RM160millions)
The project is a high end residential development with a total construction cost of RM160million located in the heart of Kuala Lumpur, Malaysia.

Proposed Mixed Development At Portion 1034 & 1036, Kookaburra Street, Erima, Pt Moresby, Papua New Guinea. For Client Premier Corporation Limited

(Estimated Construction Cost: RM100millions)
The project is a high end residential and commercial development with a total construction cost of RM100million located in Papua New Guinea. The development is led by a well established Malaysian' developer. VED is appointed as the structural designer in collaboration with the local consultant in Papua New Guinea.


Proposed Renovation On Lot 43809 & 43810 Jalan Ss 5d / 6 Section 40, Kelana Jaya, Mukim Petaling, Bandar Petaling Jaya, Petaling Jaya, Selangor Darul Ehsan For Sekolah Sri Nobel

(Estimated Construction Cost: RM6 million)
Status: Tender Stage
The project involve the development the extension of a private school and construction of additional floors above an existing hall.

Cadangan Membina 5 Blok Kondominium 7 Tingkat Yang Mengandungi 27 Unit Duplex Jenis 'Sky Suite' Dan 3 Unit Duplex Jenis 'Sky Bungalow', 2 Blok Kondominium 11 Tingkat Yang Mengandungi 16 Unit Duplex Jenis 'Sky Suite' Dan 4 Unit Duplex Jenis 'Sky Bungalow', 1 Unit Rumah Contoh Jenis 'Sky Bungalow', 1 Blok Pentadbiran 2 Tingkat Yang Mengandungi Kemudahan Gimnasium, Kolam Renang, Bilik Persalinan Dan Ruang Pejabat, 1 Unit Pondok Pengawal, 1 Unit Kebuk Sampah Dan Tempat Letak Kereta Di Atas Lot 2834s, Lot 2835s, Lot 2836s, Lot 2864s, Lengkok Harimau, Taman Golf, Bandar Ipoh, Mukim Hulu Kinta, Perak Darul Ridzuan Untuk Tetuan Golden State Properties Sdn. Bhd.

(Estimated Construction Cost: RM3 million)
Status: Building Plan Stage
The development is located in the town of Ipoh, Perak Malaysia. It consist of the construction of 27 unit of luxurious 'sky' bungalow.

Cadangan Membina Sebuah Rumah Banglo 2 Tingkat Diatas Lot 103084, Jalan Damar Bayu 5, Glenmarie Cove, Mukim Klang, Daerah Klang, Bandar Diraja Selangor, Selangor Darul Ehsan Untuk Dato Low Keng Kok.

(Estimated Construction Cost: RM4 million)
Status: Design Development 100%
The project involve the development the demolition and reconstruction of a single unit bungalow. The foundation is designed as ralf foundation to expedite the construction.

Cadangan Meroboh & Membina Semula Sebuah Rumah Banglo 3 Tingkat Di Atas Lot 28364 (No:82), Jalan Jelutong, Damansara Endah, Kuala Lumpur Untuk En. Mat Sham Bin Ahmad

(Estimated Construction Cost: RM3 million)
Status: Construction Stage 30%
The project involve the development the demolition and reconstruction of a single unit bungalow. The foundation is designed as ralf foundation to expedite the construction.

Construction And Completion Of Kelana Jaya Line Extension Station 1, 2, 3 And TPSS A & B, Including Including Civil Work, External Works And All Other Associated Works (Package A) Untuk : Kementerian Pengangkutan Malaysia
Construction, Completion, Testing And Commissioning Of Ampang Line Extension Station 1 And 2, TPSs Awan Besar Including Civil Works, External Works and All Other Associated Work (Package A)

(Estimated Construction Cost: RM150 million)
Status: Design Development 50%
VED is appointed by the turnkey contractor to provide a value engineering solution. Great cost saving are able to be achieved in the vale engineering exercise.

The Proposed Design, Construction, Commissioning and Maintenance of Medical Suite (Phase 1A), Basement Car Park (Phase 1) And Common Infrastructure / External Works On P.T. 210, Jalan Ampang, Kuala Lumpur.

(Estimated Construction Cost: RM150 million)
Status: Construction Stage Kick-off
The structural design involve state of the art full top-down with plunge-in columns, partial top-down with permanent ring slab and plunged-in columns, perimeter retaining structures contiguous bored pile wall CBP), Contiguous Bored Pile Wall (CBP). Foundation consist of a series of single bored pile capped with strip foundation (without pilecap). Vertical Framing System consist of Composite Columns (Universal Columns Encased in concrete) Combination of Reinforced Concrete. Lateral Force Resisting System by RC Shear Walls coupled with Framed Columns.

Proposed Office Block For Yayasan FAS At Lot 71380, Seksyen U5, Shah Alam, Selangor For Mahsuri Kelana Sdn Bhd

(Estimated Construction Cost: RM40 million)
Status: Design Development 50%
The project is a commercial development for Yayasan FAS Selangor. It consists of 6 storey of office floors with a gross built up of 120,000sq.ft. The structural is designed by flat slab method.

Cadangan Pembangunan Satu Blok Komersial 28 Tingkat Di Atas Lot 4532, Jalan SS7/26., Kelana Jaya, Mukim Damansara, Daerah Petaling, Selangor Darul Ehsan Untuk Tetuan Mahsuri Kelana Sdn Bhd.

(Estimated Construction Cost: RM80 million)
Status: Building Plan Stage
The project is a high end commercial development located in the heart of Petaling Jaya, Selangor, Malaysia. VED is appointed to the development not only to provide normal consultancy services but also have incorporated value engineering solutions.

Cadangan Pembangunan 70 Unit Rumah Teres 2 Tingkat Secara Tukar Syarat Dan Pecah Sempadan Tanah Secara Serentak Di Bawah Seksyen 124A (KTN) Di Atas Lot 3342 Di Kawasan Taman Indah KLIA, Mukim Labu, Daerah Sepang, Selangor Darul Ehsan Untuk Khas Perkasa Sdn. Bhd.

(Estimated Construction Cost: RM6 million)
Status: Development Order Stage
The project is a residential development located in Sepang, Selangor, Malaysia near to the KL International Airport (KLIA) which is an upcoming development transportation hub.

VALUE ENGINEERING DESIGN for Cadangan Pembangunan Pangsapuri Mewah 157 Unit Setinggi 24 Tingkat Berserta 15 Unit Villa 4 Tingkat Di Atas Lot 39868, Jalan 13/155C, Mukim Petaling, Daerah Kuala Lumpur, Wilayah Persekutuan Untuk Tetuan JalilMax Development Sdn Bhd.

(Estimated Construction Cost: RM150 million)
Status: Construction Stage 40%
"The Treez - Jalil Residence @ Bukit Jalil comprises of luxurious condominiums set on a 2.6 acre land. This residential development is designed to be the first green residential community at the southern KL. VED is appointed to provide a value engineering solution. Throug out the value engineering exercise, we are able to provide an estimated cost saving of more than RM2 million.

Cadangan Pembangunan Perniagaan Dan Membina Sebuah Kompleks Sukan (FAS), 3 Tingkat Di Atas Lot P.T. 470 & Lot P.T. 471, No.1, Jalan U15/3, Seksyen U15, 40170 Shah Alam, Selangor Darul Ehsan.

(Estimated Construction Cost: RM20 million)
Status: Construction Stage 20%
The developments involve a construction of a sport complex and two football fields for Football Association of Selangor. Extension earthworks were involved with 27m high slope at the northern boundary. Careful geotechnical design was conducted.

Cadangan Membina 92 Unit Bangunan Kedai Pejabat Yang Mengandungi : 1) 20 Unit - 6 1/2 Tingkat Kedai Pejabat 2) 36 Unit - 4 1/2 Tingkat Kedai Pejabat 3) 36 Unit - 3 Tingkat Kedai Pejabat 4) 4 Unit - Pencawang Elektrik 5) 1 Tingkat Tempat Letak Kereta Bawah Tanah Di Atas Lot P.T. 14532, Jalan SS 7/26 Kelana Jaya, Mukim Damansara, Daerah Petaling, Selangor Darul (PHASE 1 & 2)

(Estimated Construction Cost: RM100 million)
Status: Construction Stage 40%
The project is a high end commercial development located in the heart of Petaling Jaya, Selangor, Malaysia. VED is appointed to the development not only to provide normal consultancy services but also have incorporated value engineering solutions.


VALUE ENGINEERING DESIGN for Cadangan Pembangunan Yang Mengandungi: - 1) 4 Blok Pangsapuri 4 & 5 Tingkat, 2) 3 Blok Pangsapuri 9 Tingkat, 1 Unit Rumah Kelab 2 Tingkat (Yang Mengandungi Kolam Renang Tadika, Dewan Serbaguna Dan Kafeteria) Dan 2 Tingkat Basemen Tempat Letak Kereta Di Atas Lot 20926 (HSD 48924), PT 11921, Jalan Persiaran Kemajuan SS16, Mukim Damansara, Daerah Petaling, Selangor Darul Ehsan.

(Estimated Construction Cost: RM90 million)
Status: Construction Stage 60%
The project is a high end residential development with a total construction cost of RM150million for all phases. VED is appointed to provide a value engineering solution. We are able to provide an estimated cost saving of more than RM8 million

Cadangan Membina Tambahan Dan Pindaan Kilang Setingkat Kepada Komplek Kilang Pengacuan ( Casting ) 2 Tingkat Yang Sediada Di No.1, Jalan Hakim U1/24 Seksyen U1, 40150 Shah Alam, Selangor Darul Ehsan Untuk Perusahaan Otomobil Nasional Bhd.

(Estimated Construction Cost: RM4 million)
Status: Completed
The project involved the design and construction of extension of an existing car assembly factory in Shah Alam, Selangor Malaysia. Value engineering solutions were adopted and the project was completed in less than 4 months ahead of schedule.

Cadangan Pembangunan 2 Blok Apartment Berservis 24 Tingkat (408 Unit) Di Atas Lot 26771, 27842, 28161, 28354 (Lot Lama 26824) Dan Tanah Kerajaan Di Jalan Kolam Air, Desa Melawati Mukim Setapak , Wilayah Persekutuan Kuala Lumpur Untuk Perkasa Bernas (M) Sdn Bhd

Status: Completed
The project involved the checking and proposal of foundation piling remedy works. Great challenges were encounter where 90% of the total piling points have deviated more than the permissible requirement.

Proposed Piling Remedy Works For Proposed 54 Units of Semi-Detached Pool At Tropicana For Jack-In Pile Sdn Bhd

Status: Completed
The project involved the checking and proposal of foundation piling remedy works.

Proposed Sime Darby Workers Quarters At Various Sabah Estate

(Construction Cost: RM20 million)
Status: Completed
The project consisted of 350units of workers quarters location at 17 sites in Sabah, Malaysia.